云冈石窟第3窟后室顶板加固治理与监测
作者:
作者单位:

云冈石窟研究院

作者简介:

通讯作者:

中图分类号:

基金项目:


Strengthening and monitoring of the back room roof at Cave 3 of Yungang Grottoes
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 文章评论
    摘要:

    云冈石窟第3窟是云冈石窟开凿规模最大的洞窟,在开凿过程中戛然而止,特殊的洞窟结构加上千年的自然风化催生了多种病害,其中后室顶板崩塌最为严重。为此,采用岩石测试、地质雷达和钻孔勘查等多种方法,查明了顶板岩石性质和破坏形式。在钢结构支护的前提下,利用环氧树脂裂隙注浆结合玻璃纤维锚杆牵拉的方法对顶板进行加固。对施工完成后121天的裂隙、倾斜和应力监测数据进行分析,表明加固效果良好,具有广泛的借鉴意义。

    Abstract:

    Cave 3,as the largest excavation in the yungang grottoes, came to an abrupt end during its excavation process. The special structure and natural weathering for thousands of years have resulted in a variety of diseases, among which the collapse of back room roof is the most serious. By means of rock testing,physical exploration and borehole exploration, the failure forms of roof were found out. Under the premise of temporary support, the roof is strengthened by measures such as crack grouting and anchor rod pulling. The analysis of crack, tilt and stress monitoring data of 120 days after completion shows that the reinforcement effect is good and it has a wide reference significance.

    参考文献
    相似文献
    引证文献
引用本文
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2020-03-28
  • 最后修改日期:2020-04-29
  • 录用日期:
  • 在线发布日期: 2020-12-02
  • 出版日期:
您是第位访问者
主办单位:上海博物馆 编辑出版:《文物保护与考古科学》编辑委员会
地址:上海市徐汇区龙吴路1118号,上海博物馆文物保护科技中心,《文物保护与考古科学》编辑部
电话:021-54362886 传真:021-54363740 E-mail:wwbhykgkx@163.com
文物保护与考古科学 ® 2024 版权所有
沪ICP备10003390号-3
沪公网安备 31010102005301号
关闭